top of page
New Installation
SITE INSPECTION: The installation team will conduct a site inspection if necessary to evaluate site access.
INITIAL INSTALL: The initial lift installation typically takes around 1-2 days, depending on the type of installation required.
PRACTICAL COMPLETITION: This step involves installing the machine cabinet, completing wiring for the lift and machine cabinet, conducting on-site lift testing, and addressing any follow-up tasks.
HANDOVER: The handover process includes a thorough cleaning of the lift, a demonstration of emergency features, and instructions on lift usage.
bottom of page